Banca dati progetti per l'Unione europea allargata

Ordina i risultati per
Stato    

Oggetto 1 – 12 di 330

Progetto concluso

Water Supply and Wastewater of the municipality of Delnice

30.05.2017 - 31.12.2023

Delnice is located in the region of Gorski Kotar, where Switzerland and Croatia implement three water supply and wastewater projects. The uncontrolled discharge of untreated sanitary wastewater risks to pollute drinking water sources and catchment areas of the Danube and the Adriatic Sea. Moreover, the existing drinking water systems are in need of maintenance. A feasibility study, also financed through the Swiss contribution to Croatia, detects deficiencies and defines needs for action.


Progetto concluso

Water Supply and Wastewater of the municipality of Fužine

30.05.2017 - 31.12.2023

Fužine is located in the region of Gorski Kotar, where Switzerland and Croatia intend to implement three water supply and wastewater projects. The uncontrolled discharge of untreated sanitary wastewater risks to pollute drinking water sources and catchment areas of the Danube and the Adriatic Sea. Moreover, the existing drinking water systems are in need of maintenance. A feasibility study, also financed through the Swiss contribution to Croatia, detects deficiencies and defines needs for action.


Progetto concluso

Water Supply and Wastewater of the municipality of Brod Moravice

30.05.2017 - 31.12.2023

Brod Moravice is located in the region of Gorski Kotar, where Switzerland and Croatia intend to implement three water supply and wastewater projects. The uncontrolled discharge of untreated sanitary wastewater risks to pollute drinking water sources and catchment areas of the Danube and the Adriatic Sea. Moreover, the existing drinking water systems are in need of maintenance. A feasibility study, also financed through the Swiss contribution to Croatia, detects deficiencies and defines needs for action.


Progetto concluso

Ministry of Public Finance – Electronic document management system

22.09.2016 - 07.09.2019

National public entities entrusted with fiscal administration interact very regularly with various private and public actors at national, regional and local level. This is also true for Romania, where the National Agency for Fiscal Administration is situated in the Ministry of Public Finance. By improving the digitalized administration in the Ministry of Public Finance, affairs and services such as revenue collection can be ensured in a better, more reliable manner and the service level to taxpayers and the general population improved. For this purpose, Switzerland supports the modernization and reliability of the existing electronic document management system of the Ministry of Public Finance.


Progetto concluso

Sustainable Energy Action Fund

11.05.2016 - 07.11.2019

The objectives of this Fund are to enhance the sustainable energy management at the municipal level in Romania by improving municipal infrastructure, building capacity and raising awareness about energy efficiency and renewable energy in order to increase living standards, promote economic development and provide a response to climate change.


Progetto concluso

Project Preparation Facility (PPF)

02.11.2015 - 28.04.2017

The Swiss Contribution to enlargement aims to finance a broad variety of projects. The PPF to Croatia provided the necessary financial and technical assistance to the Executing Agency Croatian Waters – Hrvatske vode – to elaborate high quality project documents for seven water supply and wastewater systems in municipalities of the region Gorski Kotar. Such preparatory works contained complex studies, the drawing of preliminary plans, the receipt of location permits, etc. Based on this information, Switzerland was able to commit funds to well-elaborated projects.


Progetto concluso

Basel Trams for Sofia

Due uomini in piedi accanto al tram sopraelevato in fabbrica.

15.10.2015 - 30.06.2019

To improve the public transport system of Sofia, Switzerland will finance the donation of up to 28 used but modernized trams, the training of the personnel responsible for operation and maintenance of the trams as well as a multi-modal mobility study.


Progetto concluso

Cluj-Napoca rehabilitation of public buildings

27.08.2015 - 27.07.2019

The objectives of the project are the thermal and electric rehabilitation of four buildings in the two public schools in the city of Cluj-Napoca (George Cosbuc National College and Sigismund Toduta music high school). Besides the improvement of energy efficiency and cost savings, the project will also contribute to improved working conditions of students and put the buildings in line with sanitary requirements for public schools.


Progetto concluso

Suceava electromobility

Un uomo noleggia una bicicletta elettrica.

30.07.2015 - 07.09.2019

This project aims at promoting electromobility in the city of Suceava and throughout Romania. The supply of different types of e-vehicles and the construction of a dense and future-oriented network of charging stations are promoting this technology. The effects of the projects are a reduced consumption of energy resulting in a decreased emission of climate-effecting gases. Furthermore, an example for the use of electric vehicles as a way towards a more sustainable and green mobility is to be made.


Progetto concluso

Cluj-Napoca electric buses

Autobus elettrici

29.07.2015 - 29.10.2018

In order to promote clean urban transport and innovative, sustainable public transport, reduce energy consumption and improve air quality, old diesel buses of Cluj-Napoca were replaced by battery powered autonomous electric buses, which will complement existing public transportation systems, such as trolleybuses and trams.


Progetto concluso

Brasov rehabilitation of public buildings

Edificio scolastico ristrutturato

23.07.2015 - 23.07.2019

The objective of the project is the thermal and electric refurbishment of two public schools in the city of Brasov (Grigore Moisil Information Technology College and a primary school with kindergarten, named Grammar School No 4). Besides the improvement of energy efficiency and cost savings, the proposed measures will also result in improved working conditions of students and pupils. Additionally, the buildings standards will be in line with the Romanian sanitary requirements for public schools.


Progetto concluso

Arad rehabilitation of district heating

16.07.2015 - 18.11.2018

The activities of this project are twofold. Parts of the thermal transport network in Arad are rehabilitated. Moreover, an existing thermal substation in Aradul Nou, a residential area in Arad, is converted into a new heat boiler station. Besides the improvement of comfort to its citizens, as well as the reduction of CO2 emissions and consequent improvement of the environment, the municipal district heating rehabilitation programme is also intended to improve the finances of the Municipality of Arad.

Oggetto 1 – 12 di 330